Description
Error: Contact form not found.
The Set-up consists of a ½ bend and elbow, a sudden expansion & sudden contraction fitting from 15 mm to 25 mm, ball valve and gate valve. Pressure tapings are provided at inlet and outlet of these fittings under test. A differential manometer fitted in the line gives pressure loss of individual fitting. Present Set-up is self-contained water re-circulating unit, provided with a sump tank and a centrifugal pump etc. Flow control valve and by-pass valve are fitted in water line to conduct the experiment on different flow rates. Flow rate of water is measured with the help of measuring tank and stop watch.
Ø To determine loss of head in the fitting at various water flow rates.
Ø To measure the loss co-efficient for the pipe fittings.
Ø Water Supply and Drain
Ø Electricity Supply: Single Phase, 220 V AC, 0.5 kW.
Ø Sudden Enlargement : From 15 mm to 25 mm
Ø Sudden Contraction : From 25 mm to 15 mm
Ø Bend : ½
Ø Elbow : ½
Ø Ball Valve : ½
Ø Gate Valve : ½
Ø Water Circulation : FHP Pump, Crompton / Sharp make
Ø Flow Measurement : Using Measuring Tank with Piezometer, Capacity 25 Ltrs.
Ø Sump Tank : Capacity 50 Ltrs.
Ø Stop Watch : Electronic
Ø Control Panel : On / Off Switch, Mains Indicator etc.
The whole Set-up is well designed and arranged in a good quality painted Structure
Description
Error: Contact form not found.
WhatsApp us
No account yet?
Create an Account
Reviews
There are no reviews yet.